Permissible draft reduced

27 Jul 2021 / New Mangalore, India

The maximum permissible draft for [New Mangalore] approach channel is reduced to 13.75 metres with 1 metre of tide due to continuous siltation. This is with immediate effect.

(For information about operations in India, contact GAC India at [email protected])

Source: New Mangalore Port Trust Circular dated 27 July 2021

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.