Installation of floating pontoons off SAF Yacht Club

25 Apr 2022 / Singapore

From 1 May 2022 to 31 July 2022, installation of floating pontoons will be carried out by crane barges and supported by work boat and tug boats at the following coordinates:

  1. 01° 28.262’ (N) / 103° 49.226' (E)
  2. 01° 28.292' (N) / 103° 49.233' (E)
  3. 01° 28.274' (N) / 103° 49.297' (E)
  4. 01° 28.234' (N) / 103° 49.287' (E)
  5. 01° 28.240' (N) / 103° 49.264' (E)
  6. 01° 28.251' (N) / 103° 49.266 (E)

Safety boat will be deployed to warn other craft in the vicinity of the working area.

When in the vicinity, mariners are reminded to:

a)Keep well clear and not to enter the working area;

b)Maintain a proper lookout;

c)Proceed at a safe speed and navigate with caution;

d)Maintain a listening watch on VHF Channel 21 (Sembawang Control);

e)Communicate with Sembawang Control on VHF Channel 21 for assistance, if required

(For information about operations in Singapore, contact GAC Singapore at [email protected])

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.