Installation of Eco-shoreline at Tsuen Wan

25 Jan 2022 / Hong Kong

For approximately six months, marine works involving installation of eco-shoreline are being carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22° 22.307’N 114° 06.209’E
(B) 22° 22.285’N 114° 06.229’E
(C) 22° 22.233’N 114° 06.162’E
(D) 22° 22.253’N 114° 06.143’E

The works are being carried out by one derrick lighter. One tugboat and one work boat provide assistance.

A working area of approximately 15 metres around the derrick lighter is established. Yellow marker buoys fitted with yellow flashing lights are laid to mark the positions of the anchors extending from the derrick lighter.

A silt curtain fitted with yellow flashing lights is established within the works area. The silt curtain is a large piece of netting used to contain mud and sediments.

The hours of work are from 0700 to 1900 hours. No works are being carried out on Sundays and public holidays. Vessels employed for the works stay in the works area outside the hours of work.

Diving operations are being carried out from time to time during the hours of work.

Vessels engaged in the operations display signals as prescribed in international and local regulations.

Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind there are divers working in the area.

(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])

Source: Government of the Hong Kong SAR Marine Department Notice No.18/2022