ADNOC Testing operations of well

27 May 2022 / South of Delma Island offshore/Abu Dhabi, United Arab Emirates

The Abu Dhabi National Oil Company – ADNOC will be carrying out well testing activities from May 2022 until the end of June 2022 in the platform and excavation (002-XF) in the offshore area south of Dalma Island.

The test site is located 12 km south of Dalma Island.

It is expected that there will be intermittent burning (Flaring) for a period ranging between 7-10 days approximately: with the first ignition period occurring in May and the second in June.

Although Flaring may be visible from a distance in clear weather, there will be no environmental impact.

For safety reasons, there will be a 500-meter exclusion zone around the drilling rig (rig) where navigation will not be permitted.

Supply vessels will continue to operate from the port to support well testing activities. All waterway users and marine operators are required to take all necessary precautions and instruct their Masters to be vigilant and stay well clear from the area of operations.

For more information, please contact:
Tel: 027070003
Mobile: 0506680701
Email: [email protected]

(For information about operations in Abu Dhabi, contact GAC Anu Dhabi at [email protected])

Source: Abu Dhabi Maritime Local Marine Notice No.ADM/LMN/2022/24 dated 26 May

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.