Crude pipeline commissioned

16 Mar 2022 / Mumbai, India

Mumbai port authorities have advised that work on the online doubler welding on two 36-inch crude pipelines on trestle at the MOTJD 4th oil berth is complete and the 36-inch PG crude line was commissioned and put into operation yesterday (15 March).

Before starting the repair work, the crude pipeline is flushed with salt water, and the oil company has to receive the line content with salt water during the first operation.

For information about operations in India, contact GAC India at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.